Accessibility Tools

 

 

DBM PRESS RELEASE

DBM chief explains why proposed budget amounts are not actual expenditures and how financing safeguards protect public funds
 
MANILA, Philippines — A P10-billion funding proposal for a major infrastructure project does not mean P10 billion has already been released, much less spent.
 
This was the key clarification made by Department of Budget and Management (DBM) Acting Secretary Kim Robert C. De Leon in Episode 13 of A.S.K. — Alamin kay Sec. Kim, as he addressed misconceptions about the financing of Foreign-Assisted Projects (FAPs), including railways, expressways, and flood-control systems.
 
“Budgeting is not the same as spending. Ang NEP ay proposed budget. Hindi ito vault na puno ng cash,” Secretary De Leon emphasized.
 
The Budget Chief explained that billions of pesos appearing in the National Expenditure Program (NEP), including proposed Unprogrammed Appropriations (UA), do not automatically represent available cash or actual government expenditures.
 
“Ang pagkakaroon ng appropriation o budget authority ay hindi nangangahulugan na nailabas na ang pera. At lalong hindi ibig sabihin na nagastos na ito,” he stressed.
 
Foreign-assisted does not mean free
 
Secretary De Leon also clarified that foreign assistance does not necessarily mean another country or international institution shoulders the entire project cost.
 
“Foreign-assisted does not mean foreign-funded lahat. At lalong hindi ibig sabihin na libreng pera ito,” he said.
 
FAPs may be financed through Loan Proceeds, or funds borrowed from international development partners, and the Government of the Philippines (GOP) Counterpart, representing the portion funded by the Philippine government.
 
Using the example of a P10-million house financed through a P7-million loan and P3 million in personal funds, Secretary De Leon illustrated how foreign financing and government counterpart funding can jointly support a major project.
 
However, securing financing requires more than identifying a willing lender.
 
“Hindi porke may magandang project idea, puwede nang umutang. At hindi porke may gustong magpautang, puwede nang tanggapin,” he emphasized.
 
Implementing agencies must prepare proposals detailing the project’s purpose, cost, implementation plan, and expected public benefits. Major projects also undergo applicable evaluation and approval processes, including review by the Investment Coordination Committee (ICC), which assesses their economic justification, financial viability, and potential benefits.
 
“Dapat may plano. Dapat may numbers. At dapat may malinaw na resulta para sa tao. Kapag pera ng bayan ang nakataya, hindi puwedeng ‘puwede na,’” Secretary De Leon stressed.
 
Why funds under Unprogrammed Appropriations are not automatically available
 
The Budget Secretary explained that the status and timing of foreign financing arrangements determine how a project’s funding requirements may be reflected in the proposed national budget.
 
When financing arrangements are completed and applicable conditions are met, the corresponding funding requirements may be included under Programmed Appropriations.
 
If foreign financing has not yet been finalized during budget preparation, the GOP Counterpart may be included in the implementing agency’s proposed budget, while the Loan Proceeds may be placed under Unprogrammed Appropriations — Support to Foreign-Assisted Projects, subject to applicable budget rules.
 
Secretary De Leon emphasized that UA represents standby budget authority, not readily available cash. Before funds can be released, agencies must satisfy the conditions prescribed under existing laws and budget rules, including the necessary financing documents and approvals.
 
“Parang may nakahandang budget authority, pero hindi ibig sabihin na may cash na puwedeng kunin at gastusin anytime,” he explained.
 
He also clarified that if foreign financing does not materialize, the government does not automatically assume the entire project cost. The implementing agency must evaluate its options, including securing financing from another development partner.
 
Faster implementation without compromising safeguards
 
To help avoid unnecessary delays, Secretary De Leon highlighted National Budget Circular No. 581, which clarifies financing processes and arrangements for FAPs, and Early Procurement Activities (EPA), which allow certain procurement activities for qualified projects included in the NEP to begin ahead of time, subject to applicable rules.
 
“Pabilisin ang proseso, pero huwag i-shortcut ang safeguards,” the Budget Chief emphasized.
 
He stressed that faster implementation must go hand in hand with compliance with financing, procurement, and fund-release requirements.
 
Every billion must come with accountability
 
Secretary De Leon urged Filipinos to look beyond the amounts proposed for major infrastructure projects and examine where financing comes from, how much the government must contribute, and whether the requirements for releasing funds have been satisfied.
 
“Because in government budgeting, a big number should always come with an equally big responsibility to explain where it comes from, where it goes, and what the Filipino people get in return,” he said.
 
For the Budget Chief, responsible public spending ultimately means ensuring that government resources translate into tangible benefits for Filipinos.
 
“May proseso. May safeguards. May pananagutan. At dapat, may malinaw na pakinabang sa mamamayan,” Secretary De Leon concluded.
 
A.S.K. — Alamin kay Sec. Kim is DBM’s public information series that simplifies national budget concepts and processes to help Filipinos better understand how public funds are planned, allocated, released, and used.
 
Watch Episode 13, “Paano Pinopondohan ang Foreign-Assisted Projects sa NEP?” here:
 
 
 
[END]
 
FILIPINO VERSION
 
DBM PRESS RELEASE
Ika-10 ng Oktubre 2026
 
 
SEC. KIM: BILYUN-BILYONG PISO NA PANUKALA PARA SA FOREIGN-ASSISTED PROJECTS, HINDI NANGANGAHULUGANG NAILABAS NA ANG PONDO
DBM chief, ipinaliwanag kung bakit hindi aktuwal na paggasta ang mga halagang nakasaad sa proposed budget at kung paano pinoprotektahan ng financing safeguards ang pondo ng bayan
 
MANILA, Philippines — Ang panukalang P10 bilyong pondo para sa isang malaking infrastructure project ay hindi nangangahulugang nailabas na ang P10 bilyon, at lalong hindi nangangahulugang nagastos na ito.
 
Ito ang paglilinaw ni Department of Budget and Management (DBM) Acting Secretary Kim Robert C. De Leon sa Episode 13 ng A.S.K. — Alamin kay Sec. Kim, kung saan tinalakay niya ang mga maling akala tungkol sa financing ng Foreign-Assisted Projects (FAPs), kabilang ang mga railway, expressway, at flood-control system.
 
“Budgeting is not the same as spending. Ang NEP ay proposed budget. Hindi ito vault na puno ng cash,” pagbibigay-diin ni Secretary De Leon.
 
Ipinaliwanag ng Budget Chief na ang mga bilyong pisong nakasaad sa National Expenditure Program (NEP), kabilang ang panukalang pondo sa ilalim ng Unprogrammed Appropriations (UA), ay hindi nangangahulugang mayroon nang cash na magagamit o aktuwal nang nagastos ng gobyerno.
 
“Ang pagkakaroon ng appropriation o budget authority ay hindi nangangahulugan na nailabas na ang pera. At lalong hindi ibig sabihin na nagastos na ito,” giit niya.
 
Hindi ibig sabihin na kapag foreign-assisted, libre na ang pondo
 
Nilinaw din ni Secretary De Leon na hindi nangangahulugang ibang bansa o international institution ang sasagot sa buong gastos ng isang proyekto dahil lamang foreign-assisted ito.
 
“Foreign-assisted does not mean foreign-funded lahat. At lalong hindi ibig sabihin na libreng pera ito,” paliwanag niya.
 
Maaaring pondohan ang FAPs sa pamamagitan ng Loan Proceeds, o pondong hiniram mula sa international development partners, at Government of the Philippines (GOP) Counterpart, o bahaging sasagutin ng gobyerno ng Pilipinas.
 
Para mas madaling maintindihan, gumamit si Secretary De Leon ng halimbawa ng isang bahay na nagkakahalaga ng P10 milyon, kung saan P7 milyon ang manggagaling sa loan at P3 milyon naman ang sariling ambag ng may-ari. Sa ganitong paraan, maaaring pagsamahin ang foreign financing at government counterpart funding upang matustusan ang isang malaking proyekto.
 
Pero hindi sapat na may proyektong gustong gawin at may handang magpautang para makakuha agad ng financing.
 
“Hindi porke may magandang project idea, puwede nang umutang. At hindi porke may gustong magpautang, puwede nang tanggapin,” giit niya.
 
Kailangang maghanda ang implementing agencies ng project proposals na nagpapaliwanag sa layunin ng proyekto, kabuuang halaga, plano sa pagpapatupad, at inaasahang pakinabang nito sa publiko.
 
Dumaraan din ang malalaking proyekto sa mga kinakailangang evaluation at approval process, kabilang ang pagsusuri ng Investment Coordination Committee (ICC), na tumitingin sa economic justification, financial viability, at posibleng pakinabang ng mga ito.
 
“Dapat may plano. Dapat may numbers. At dapat may malinaw na resulta para sa tao. Kapag pera ng bayan ang nakataya, hindi puwedeng ‘puwede na,’” ayon kay Secretary De Leon.
 
Bakit hindi agad magagamit ang pondong nasa Unprogrammed Appropriations?
 
Ipinaliwanag ng Budget Chief na nakadepende sa status at timing ng foreign financing arrangements kung paano maisasama ang funding requirements ng isang proyekto sa proposed national budget.
 
Kapag kumpleto na ang financing arrangements at natugunan ang mga kinakailangang kondisyon, maaaring maisama ang kaukulang funding requirements sa Programmed Appropriations.
 
Kung hindi pa tapos ang foreign financing habang binubuo ang proposed national budget, maaaring isama sa proposed budget ng implementing agency ang GOP Counterpart. Samantala, maaaring ilagay ang Loan Proceeds sa ilalim ng Unprogrammed Appropriations — Support to Foreign-Assisted Projects, alinsunod sa mga naaangkop na budget rules.
 
Binigyang-diin ni Secretary De Leon na ang UA ay standby budget authority, hindi cash na maaari nang kunin at gastusin anumang oras. Bago mailabas ang pondo, kailangang matugunan ng mga ahensya ang mga kondisyon sa ilalim ng umiiral na batas at budget rules, kabilang ang mga kinakailangang financing document at approval.
 
“Parang may nakahandang budget authority, pero hindi ibig sabihin na may cash na puwedeng kunin at gastusin anytime,” paliwanag niya.
 
Nilinaw din niya na kung hindi matuloy ang foreign financing, hindi automatic na sasagutin ng gobyerno ang buong halaga ng proyekto. Kailangang suriin muna ng implementing agency ang mga posibleng hakbang, kabilang ang pagkuha ng financing mula sa ibang development partner.
 
Mas mabilis na pagpapatupad, pero hindi isinasantabi ang safeguards
 
Upang maiwasan ang mga delay, binanggit ni Secretary De Leon ang National Budget Circular No. 581, na naglilinaw sa financing processes at arrangements para sa FAPs.
 
Nariyan din ang Early Procurement Activities (EPA), na nagbibigay-daan upang masimulan nang mas maaga ang ilang procurement activities para sa mga kwalipikadong proyektong kasama sa NEP, alinsunod sa mga naaangkop na patakaran.
 
“Pabilisin ang proseso, pero huwag i-shortcut ang safeguards,” ani ng Budget Chief.
 
Binigyang-diin niya na kailangang sabayan ng pagsunod sa financing, procurement, at fund-release requirements ang pagpapabilis sa pagpapatupad ng mga proyekto.
 
Bawat bilyon, may kaakibat na pananagutan
 
Hinimok ni Secretary De Leon ang mga Pilipino na tingnan hindi lamang ang halagang inilaan para sa malalaking infrastructure project, kundi pati kung saan nanggagaling ang financing, magkano ang ambag ng gobyerno, at kung natugunan na ang mga kinakailangan bago mailabas ang pondo.
 
“Because in government budgeting, a big number should always come with an equally big responsibility to explain where it comes from, where it goes, and what the Filipino people get in return,” giit niya.
 
Para sa Budget Chief, ang responsableng paggasta ng pondo ng bayan ay nangangahulugang kailangang matiyak na nagdudulot ang resources ng gobyerno ng kongkretong pakinabang sa mga Pilipino.
 
“May proseso. May safeguards. May pananagutan. At dapat, may malinaw na pakinabang sa mamamayan,” pagtatapos ni Secretary De Leon.
 
Ang A.S.K. — Alamin kay Sec. Kim ay serye ng DBM tungkol sa pagbibigay-kaalaman sa publiko na nagpapaliwanag sa national budget, mga proseso nito, at mga konseptong madalas hindi nauunawaan sa simple at madaling maintindihan na paraan—dahil hindi dapat nakalilito ang budget; dapat itong maunawaan ng bawat Pilipino.
 
Panoorin ang Episode 13, “Paano Pinopondohan ang Foreign-Assisted Projects sa NEP?” dito:
 
 
 
 
[END]